BIM Jargon Buster

BIM Jargon Buster

Sorting the BIM from the BEP

It is not uncommon to feel ‘Bamboozled by BIM’ given the sheer volume of new technical terms that are being used in connection with BIM. The world of BIM is one littered with confusing terminology and unfamiliar acronyms. To help firms navigate the maze of jargon, we put together a free jargon buster.

Asset Management System (AIM) - The digital model that is a composite of the data and information (graphical and non-graphical) necessary to support the ongoing management and operation of the facility. This may include existing information, new information and information gathered from the (PIM) model created during construction. 

 

BEP – BIM Execution Plan – This is a critical document as it underpins project integration and is a written plan to bring together all of the tasks and related information with all the stakeholders and processes. This should be agreed at the outset and defines what BIM means for the project. This will define the standards being adopted, outputs required, when these should be supplied and in what format, plus any supporting documentation. It may stipulate the software to be used but in most cases this can be accommodated by imports and exports from existing software. The BEP is a working document that should be regularly reviewed and evolve as design teams, suppliers and manufactures change throughout the project.

 

BIM - Building Information Modelling - a process of designing, constructing or operating a building, infrastructure or landscape asset using electronic information. What this means in practice is that a project can be designed and built using data sets and images on computer, before it is built for real. Described as a game-changing technology, it embeds key project and asset data within a multidimensional computer model that can be used for effective management of information throughout the project lifecycle from its earliest inception to when the asset is fully operational.

 

BIM Level 0 – This is supported by simple Computer Aided Design (CAD) and uses lines, shapes and text to produce paper 2D drawings and text schedules. Data can be provided as a hard copy and is typically unstructured and inconsistent.

 

BIM Level 1 - This is the use of CAD in both 2D and, where appropriate, 3D with some attached data, such as functional and physical aspects that supports design. The data is simply managed in digital formats and exchanged between design team members, client and operations managers.

 

BIM level 2 - This applies to all Government-funded projects from January 2016 including buildings, infrastructure and landscape. It builds on level 1 CAD but incorporates additional information associated with objects related to cost and time. Project roles and responsibilities are defined to meet the Employers Information Requirements (EIR). Standards, protocols and methods of working are defined to deliver the project information required by the employer. Information can be supplied in different formats provided these can be incorporated into a single federated model where clash avoidance, project management and cost can be assessed and managed. Spreadsheets can be presented in COBie format according to client data requirements. IFC standardised specifications may be applied to support data interoperability.

 

BIM level 3 or iBIM – Currently being defined, in February 2015, The Digital Built Britain strategy was launched and represents the outcomes and recommendations for the next stage of the Building Information Journey, building on the standards delivered by BIM Level 2, it is expected to provide for fully interoperable and integrated design, delivery and asset management using open data resources. It will allow planning for long-term management of an asset even after it has been delivered, so can include scheduled maintenance and replacement of objects within a project, thereby helping to predict and manage whole life costs.

 

BIM 4D – utilises BIM data to analyse an assets construction over time.

 

BIM 5D - supports cost management of a project and asset over time.

 

BIM 6D – considers the long-term management of an “as built” asset by the facilities management team. 

 

BIMObject - a cloud based, BIM content platform

 

BIM Protocol - This CIC standard is a supplementary legal agreement and is designed to be used on BIM projects to identify the models that are required to be produced by the project team and their clearly defined purpose, obligations, liabilities and associated limitations. Second Edition 2018

 

BIM Toolkit - The NBS BIM Toolkit provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of an asset’s lifecycle.

 

BIP – BIM Implementation Plan – The blueprint for integrating BIM into an organisation’s working practices. This should align to the objectives and aspirations of the organisation, its business partners, its skill base, levels of investment and the nature and scale of projects that it wishes to undertake now and in the future.

 

Blockchain - is a digital ledger based on a “trust less” proof mechanism and where transactions are immutable and transparent. This method of “payment” has potential benefits for construction as it could indelibly link digital components in 3D models to real world features and allows for life time tracking.

 

BS 1192:2007 + A2:2016 -  Collaborative production of architectural, engineering and construction information. Code of practice – This defines the methodology for managing the production and distribution of construction data using clearly defined process for collaboration. It provides a guide to software developers to support this process.

 

BS 1192-4:2014 - This is the specification that defines the expectation for the exchange and management of information necessary for collaboration throughout the lifecycle of an asset, using COBie.

 

Building Data Dictionary – This is an agreed common vocabulary for disparate component parts allowing an open Building Information Model to link data from many sources, such as information from a product manufacturer, room requirements, cost data or environmental data and so improving interoperability.

 

CDE - Common Data Environment – Defines the process, methodology and responsibilities for sharing a single source of information with all members of the project team. Creating a single source of information encourages collaboration and helps avoid duplication and mistakes.

 

Classification - a nomenclature for grouping together and describing objects based on clearly agreed standards and terms of reference. Examples include, CI/SfB, CAWS. NRM, OmniClass and Uniclass 2015.

 

COBie – Construction Operations Building Information Exchange - This is a structured, universal database where data sets for a wide range of products can be stored providing information for the commissioning, operation and maintenance of a project. It can be viewed and edited in standard spreadsheet software enabling engagement at all levels of the design, operations and supply chain. . COBie may include links and specification information that describes the objects but does not include any geometry information. (See IFC below)

 

Data Drops – defined in the Employer’s Information Requirements as key milestones, they provide a snap-shot at each stage of the project to ensure it is properly controlled and can continue to meet the employer’s requirements and can be delivered to budget and on time.

 

Digital Plan of Works - defines what should be delivered at each stage of construction project, from inception through to management of the asset.

 

Digital Twin - the virtual representation of an asset that exists in the real world and where sensors onsite provide a feedback loop on its status when subject to environmental change. The virtual model can be used to not only report on its current state but could be used to predict future events and consider “what if” scenarios. 

 

EIR - Employers Information Requirements– This the brief or specification provided by the employer/client. It sets out and defines the requirements of the client and information that the employer wishes to procure, in order to be able to develop and operate theasset in the future.

 

Federated Model – A single model consisting of linked but distinct component data models and data from different sources that do not lose their identity or integrity by being linked but these distinct models do not interact directly so a change to one component in the model does not trigger an automatic change in another component within the federated model. Each component has clear authorship. The federated model is useful for design coordination, project development, clash detection and approvals.

 

Government Soft Landings - Form of graduated handover for both new and refurbished buildings where the project team is contracted to watch over the asset, support the occupant and fine-tune the systemspost-completion.

 

IFC - Industry Foundation Classes - The Industry Foundation Classes (IFC) is an open, neutral and standardised specification for Building Information Models, and is in the process of becoming an international Standard as ISO16739. IFC includes both specification information and geometry, enabling the object to be displayed.

 

Internet of Things (IoT) - a network of physical objects capable of gathering and sharing electronic data that can be used for analysis. The connected devices will self-report in real time and the sensory feedback can be processed to find trends, improve efficiency, drives change, highlight issues more quickly (or before they happen!) and consider “What if” scenarios by testing in the virtual world.

 

Level of Model Definition (LOMD) – Comprises:

 

Open BIM - This enables all participants to access information on a project without the need to use prescribed software. This level of transparency aims to eliminate errors and thereby reduce costs, save time and ensure effective implementation as all parties will be able to input into and access the model and identify any issues before the physical project is delivered. Open BIM objects are being developed by BuildingSMART and are software neutral. This is still at an early stage of development and the number is increasing by the month.

 

PAS - Publicly Available Specification – A sponsored fast-track standard driven by the needs of the stakeholders and developed according to guidelines set out by the British Standards Institution. They are reviewed within two years to assess whether they will be revised, withdrawn or become a formal standard.

 

PAS 1192-2:2013 - This is the specification for information management for the capital/delivery phase of construction projects using BIM and sets out the requirements for BIM Level 2.

 

PAS 1192-3:2014 - This is the specification for information management for the operational phase of construction projects using BIM and builds on the code of practice for the collaborative production of information defined in BS1192:2007.

 

PAS 1192-5:2015 - This is the specification that provides a framework to assist asset owners understand the vulnerability of exchanging data transparently, openly and digitally to ensure the information is being shared in a securely minded way.

 

PAS 1192-6:2018 - This provides guidance on how Health and Safety should be produced and used throughout the entire project lifecycle, including in-use.

 

Project Information Model (PIM) - The information model that is developed during the design and construction phase. It is likely to be based on the BIM model, non-graphical data and associated documentation.

 